When Does a Renovation Require Structural Drawings?
A renovation may require structural drawings when it changes the parts of a building that support floors, walls, roofs, or foundations. Common examples include removing a load-bearing wall, installing a new beam, enlarging an opening, modifying roof framing, lowering a basement, or building an addition.
Structural engineered drawings show how the proposed work should be built so that loads continue to transfer safely through the structure. They may identify beam sizes, column locations, joist layouts, footing dimensions, connection details, reinforcement, and temporary support requirements.
Not every renovation needs structural drawings. Cosmetic projects that do not affect load-bearing components may proceed without them, subject to local permit requirements. The need for drawings depends on the scope of work, the existing building, and the rules of the applicable building authority.
What Are Structural Drawings?
Structural drawings are technical construction documents that describe the load-bearing parts of a building.
They may show:
- Foundations
- Footings
- Beams
- Columns
- Load-bearing walls
- Floor joists
- Roof rafters
- Roof trusses
- Headers and lintels
- Structural connections
- Reinforcement
- Temporary shoring
- Construction sequencing
The drawings help explain how structural loads should move from the roof and upper floors down through the walls, beams, posts, and foundations.
They may be prepared as a separate structural package or coordinated with architectural renovation plans.
Why Are Structural Drawings Important?
Structural changes can affect more than the area being renovated.
For example, removing one wall may change how loads are transferred through:
- The floor above
- The roof
- Nearby walls
- Supporting beams
- Basement columns
- Foundation walls
- Footings below
Structural drawings provide clear instructions for replacing or modifying the support that was originally provided by the altered component.
They can help:
- Reduce construction uncertainty
- Support a permit application
- Clarify contractor pricing
- Identify required materials
- Coordinate structural and architectural plans
- Prevent unsafe field changes
- Document the intended repair or alteration
- Support inspections during construction
- Reduce the risk of sagging, cracking, or settlement
Does Every Renovation Need Structural Drawings?
No. Many renovations are primarily cosmetic and do not alter the building’s structural system.
Projects that may not require structural drawings include:
- Painting
- Replacing flooring
- Updating cabinets without changing the layout
- Replacing countertops
- Installing new appliances
- Updating light fixtures
- Replacing plumbing fixtures
- Installing decorative wall finishes
- Replacing non-structural interior doors
- Repairing drywall
- Replacing trim
Even a cosmetic renovation can become structural if walls, framing, or foundations are altered.
For example, a kitchen renovation may not require structural drawings when cabinets and finishes are simply replaced. Drawings may be needed if the project also removes a wall, enlarges an opening, or cuts floor joists for new plumbing.
When Are Structural Drawings Usually Required?
Structural drawings are commonly needed when a renovation changes the building’s load path or requires new load-bearing components.
Removing a Load-Bearing Wall
Removing a load-bearing wall is one of the most common reasons structural drawings are required.
A load-bearing wall may support:
- Floor joists
- Roof framing
- Another wall
- A beam
- Ceiling joists
- Concentrated loads from above
When the wall is removed, its load usually needs to be transferred to a new beam and supporting posts.
The drawings may show:
- Beam size and material
- Beam elevation
- Post sizes
- Post locations
- Connections
- Required bearing
- New footings
- Support below
- Temporary shoring
The beam cannot be designed in isolation. The posts and foundations below must also be able to carry the new concentrated loads.
Creating an Open-Concept Layout
Open-concept renovations often involve removing several walls or creating long openings between rooms.
Structural drawings may be needed to coordinate:
- Long-span beams
- Flush or dropped beam options
- Steel or engineered wood members
- Posts at beam ends
- Foundation support
- Ceiling framing
- Floor framing above
- Mechanical and plumbing conflicts
Long openings may create large point loads that require new posts and footings in the basement or crawl space.
Enlarging a Door or Window Opening
Increasing the width of a door or window opening may require a larger header or lintel.
Structural drawings may be required when the opening is located in:
- An exterior wall
- A load-bearing interior wall
- A foundation wall
- A masonry wall
- A shear wall or braced wall
The drawings may specify:
- Header size
- Number of supporting studs
- Steel lintel size
- Bearing length
- Connections
- Reinforcement
- Support below
- Temporary shoring
Large sliding doors, folding glass walls, and oversized windows often require project-specific design.
Installing a New Beam
A renovation may require a beam when:
- A wall is removed
- A floor span is increased
- A column is relocated
- A large opening is created
- Existing framing is reinforced
- A roof load is redirected
The structural drawings may identify:
- Beam material
- Beam depth and width
- Steel grade or engineered wood type
- Splices
- Connections
- Supports
- Bearing
- Fire protection where applicable
- Deflection limits
The beam design must account for both strength and movement.
Removing or Relocating a Column
A basement or main-floor column may interfere with a proposed layout.
Removing it usually requires redesigning the beam or framing above.
The new design may involve:
- A larger beam
- A longer span
- Steel reinforcement
- New columns
- New footings
- Stronger connections
- Temporary support
A column should not be removed simply because it appears inconvenient or lightly loaded.
Modifying Floor Joists
Structural drawings may be required when floor joists are:
- Cut
- Notched
- Drilled beyond permitted limits
- Removed
- Extended
- Reinforced
- Repaired
- Modified around a stair opening
- Altered for an elevator
- Changed for plumbing or ductwork
The drawings may show:
- Joist reinforcement
- Sistered members
- Replacement joists
- New headers
- Trimmer joists
- Hangers
- Blocking
- Beam support
- Connection requirements
Improper joist modifications can lead to floor sagging, vibration, cracking, or failure.
Creating a New Stair Opening
A stair opening usually requires changes to the floor framing.
Structural drawings may be needed to design:
- Headers
- Trimmer joists
- Joist hangers
- Support below
- Guard connections
- Landings
- Openings through multiple floors
The stair location should be coordinated early because the required framing may affect walls, rooms, and mechanical systems.
Modifying Roof Framing
Roof alterations commonly require structural drawings.
Examples include:
- Removing trusses
- Cutting rafters
- Adding dormers
- Raising the roof
- Creating a vaulted ceiling
- Installing large skylights
- Adding a rooftop deck
- Modifying a roof valley
- Changing the roof shape
- Adding heavy rooftop equipment
Roof trusses are engineered systems and should not be cut or altered without an approved repair or modification detail.
Creating a Vaulted Ceiling
A vaulted ceiling renovation may involve removing ceiling joists or altering roof framing.
Ceiling joists may help prevent exterior walls from spreading outward.
Structural drawings may include:
- Ridge beams
- New rafters
- Collar ties
- Wall reinforcement
- Posts
- Footings
- Connections
- Roof bracing
Simply removing ceiling joists can create serious roof and wall movement.
Adding a Dormer
Dormers alter the roof framing and may create new concentrated loads.
Structural drawings may show:
- Headers
- Double rafters
- Valley framing
- Roof beams
- Wall support
- Floor reinforcement
- Connections to the existing roof
The dormer design must also coordinate with weatherproofing and drainage.
Converting an Attic Into Living Space
Attic floor framing is often designed only to support ceiling finishes and limited storage.
Converting the space into a bedroom, office, or other occupied area may require drawings for:
- New floor joists
- Beams
- Stair openings
- Dormers
- Roof reinforcement
- Load-bearing walls
- Posts
- Foundation support
The existing structure should be checked before additional occupancy loads are introduced.
Lowering a Basement
Basement lowering is a major structural renovation.
It may involve:
- Underpinning
- Benching
- Excavation beside footings
- New foundations
- Slab replacement
- Drainage
- Temporary shoring
- Foundation-wall extensions
Structural drawings may specify:
- Underpinning sections
- Excavation sequence
- Maximum open sections
- Reinforcement
- Concrete strength
- Footing sizes
- Waterproofing coordination
- Temporary support
Excavating below an existing footing without proper design can cause settlement or foundation failure.
Underpinning a Foundation
Underpinning strengthens or extends an existing foundation.
It may be required when:
- The basement is being lowered
- The existing foundation has settled
- New loads are being added
- Footings are inadequate
- Nearby excavation affects the building
- A new addition connects below grade
The drawings may show:
- Underpinning layout
- Section sequence
- Reinforcement
- Dowels
- Concrete details
- Load-transfer points
- Temporary support
- Connections to the existing foundation
Cutting an Opening in a Foundation Wall
A new basement door, window, or walkout entrance may require structural drawings.
The opening may affect:
- Vertical support
- Lateral soil resistance
- Foundation continuity
- Reinforcement
- Drainage
- Nearby footings
The design may require:
- Steel lintels
- Reinforced concrete beams
- New columns
- Foundation-wall reinforcement
- Retaining walls
- New footings
- Waterproofing details
A foundation opening should not be treated like a simple opening in a non-load-bearing partition.
Building a Home Addition
Most home additions involve structural work.
Structural drawings may cover:
- Footings
- Foundations
- Screw piles
- Grade beams
- Floor framing
- Roof framing
- Load-bearing walls
- Beams
- Columns
- Large openings into the existing house
- Connections between old and new construction
The drawings should also address how the new structure will move relative to the existing home.
Adding a Second Storey
A second-storey addition usually requires a detailed structural assessment and drawing package.
The existing building may need to be checked for:
- Foundation capacity
- Wall capacity
- Beam capacity
- Floor framing
- Lateral stability
- Existing settlement
- Roof removal
- Temporary support
The drawings may show both new construction and reinforcement of the existing structure.
Building a Deck, Balcony, or Rooftop Terrace
Structural drawings may be required for:
- Elevated decks
- Large decks
- Covered decks
- Balconies
- Rooftop terraces
- Decks supporting hot tubs
- Decks on sloped sites
- Structures with unusual spans
The drawings may identify:
- Footings
- Piles
- Posts
- Beams
- Joists
- Ledger connections
- Bracing
- Guards
- Waterproofing coordination
Poor ledger connections and inadequate footings are common concerns in deck construction.
Installing a Hot Tub
A filled hot tub creates a significant concentrated load.
Structural drawings may be needed when the hot tub is located on:
- A deck
- A balcony
- An upper floor
- A rooftop
- Suspended floor framing
The engineer may assess:
- Joist capacity
- Beam capacity
- Post locations
- Footings
- Vibration
- Connections
- Waterproofing
Installing Heavy Equipment or Features
Heavy items can require structural review even when no walls are being removed.
Examples include:
- Large aquariums
- Masonry fireplaces
- Heavy safes
- Commercial kitchen equipment
- Stone flooring
- Concrete toppings
- Large kitchen islands
- Mechanical equipment
- Home gym equipment
- Storage systems
Structural drawings may be required when the existing floor or roof system needs reinforcement.
Repairing Structural Damage
Structural drawings may be needed to repair damage caused by:
- Fire
- Flooding
- Water leaks
- Wood rot
- Vehicle impact
- Tree impact
- Foundation settlement
- Construction defects
- Insect damage
- Corrosion
The drawings may identify:
- Members to remove
- Members to retain
- Reinforcement
- Temporary shoring
- Replacement materials
- Connections
- Repair sequence
Damage should be assessed before contractors cover or remove critical structural components.
Repairing Foundation Cracks or Bowed Walls
Not every foundation crack requires drawings.
Structural drawings may be needed when the repair involves:
- Wall reinforcement
- Steel braces
- Wall anchors
- Reinforced concrete
- Rebuilding part of the foundation
- Underpinning
- New footings
- Settlement repair
Waterproofing details alone may not address a foundation wall that has moved.
Converting a Garage Into Living Space
A garage conversion may require structural drawings when it includes:
- Replacing garage doors with walls
- Adding new foundations
- Modifying large headers
- Raising the floor
- Altering roof support
- Creating new openings
- Supporting new loads
The existing slab may not have been designed to support load-bearing walls.
Building Above an Existing Garage
Adding living space above a garage commonly requires drawings for:
- Foundation review
- Garage door headers
- Wall reinforcement
- New floor framing
- New roof framing
- Lateral bracing
- Connections to the main house
The large garage door opening can make the structure more challenging to reinforce.
Converting a Porch or Sunroom
An existing porch may not have foundations or framing suitable for year-round living space.
Structural drawings may be required to upgrade:
- Footings
- Piles
- Floor framing
- Roof framing
- Wall support
- Connections to the house
The new enclosed space may carry greater loads than the original porch.
Adding Solar Panels or Rooftop Equipment
Structural drawings or calculations may be needed when a roof will support:
- Solar panels
- Mechanical units
- Water tanks
- Green roofs
- Antennas
- Equipment platforms
The engineer may review:
- Roof member capacity
- Concentrated loads
- Connections
- Wind uplift
- Roof condition
- Added snow accumulation
- Vibration
Do Structural Repairs Always Need Drawings?
Not every repair needs a full drawing package.
A minor repair may be documented through:
- A letter
- A sketch
- A repair detail
- A marked-up photograph
- A written specification
Formal drawings are more likely to be required when:
- Several components are affected
- New beams or columns are installed
- Foundations are altered
- Construction is complex
- A permit is required
- Temporary shoring is needed
- Contractors need detailed dimensions
- The building authority requests sealed documents
Are Structural Drawings Required for a Building Permit?
Structural drawings are often required when a renovation alters load-bearing components.
The permit authority may request drawings showing:
- Existing conditions
- Proposed work
- Demolition
- Beam sizes
- Column locations
- Joist layouts
- Footings
- Connections
- Reinforcement
- Design notes
Not every permit requires engineering. Some straightforward work may be permitted using prescriptive building requirements.
Permit requirements vary by location, project type, and building classification.
Who Prepares Structural Drawings?
Structural drawings are typically prepared by a qualified structural engineer.
Depending on local regulations and the complexity of the project, some simple structural details may be prepared by another qualified building professional using prescriptive requirements.
A structural engineer is generally appropriate when the project involves:
- Complex load paths
- Large spans
- Existing structural damage
- Foundations
- Underpinning
- Steel framing
- Unusual materials
- Significant alterations
- Project-specific calculations
What Is the Difference Between Architectural and Structural Drawings?
Architectural drawings focus on the design, layout, and appearance of the renovation.
They may show:
- Room layouts
- Dimensions
- Doors and windows
- Finishes
- Elevations
- Ceiling heights
- Building sections
- Exterior appearance
Structural drawings focus on the load-bearing system.
They may show:
- Beam sizes
- Joist layouts
- Columns
- Footings
- Foundation walls
- Reinforcement
- Connections
- Structural notes
The two drawing sets should be coordinated.
For example, an architectural drawing may show a wide opening, while the structural drawing specifies the beam and posts needed to support it.
What Information Is Included in Structural Drawings?
The exact information depends on the renovation.
A structural package may include:
- General structural notes
- Design criteria
- Existing framing plans
- Demolition plans
- Proposed framing plans
- Foundation plans
- Beam schedules
- Column schedules
- Joist sizes and spacing
- Header sizes
- Footing dimensions
- Reinforcement details
- Connection details
- Fastener requirements
- Temporary shoring notes
- Construction sequences
- Material specifications
The drawings may also refer to manufacturer requirements for engineered wood, steel connectors, piles, or other proprietary products.
What Is a Structural Framing Plan?
A framing plan shows how the floor or roof structure is arranged.
It may identify:
- Joist direction
- Joist size
- Joist spacing
- Beams
- Headers
- Columns
- Load-bearing walls
- Openings
- Hangers
- Blocking
- Bearing points
Framing plans help contractors understand how individual components work together.
What Is a Foundation Plan?
A foundation plan shows the support below the building.
It may include:
- Footing locations
- Footing sizes
- Foundation walls
- Piers
- Columns
- Pile locations
- Grade beams
- Reinforcement
- Slab details
- Underpinning
The foundation plan should align with the loads from walls, beams, and posts above.
What Are Connection Details?
Connection details show how structural components should be joined.
They may identify:
- Bolt sizes
- Screw types
- Nail patterns
- Steel plates
- Joist hangers
- Welds
- Anchors
- Bearing requirements
- Post bases
- Beam seats
- Uplift connectors
A structural system is only as reliable as its connections.
Do Structural Drawings Include Temporary Shoring?
They may.
Temporary shoring may be required when:
- A load-bearing wall is removed
- A beam is replaced
- A column is relocated
- A foundation is underpinned
- A large opening is created
- Fire or water damage is repaired
- Roof framing is altered
The drawings may include general shoring requirements or project-specific support details.
The contractor may also be responsible for developing a detailed shoring plan depending on the project and local requirements.
Why Should Structural Drawings Be Completed Before Demolition?
Demolition can expose or remove load-bearing components.
Starting without a structural plan can lead to:
- Accidental removal of a structural wall
- Inadequate temporary support
- Unexpected beam sizes
- Post locations that conflict with the design
- Inadequate foundation support
- Permit delays
- Cost increases
- Material changes
- Unsafe conditions
Completing the design first allows the renovation team to plan the work in the correct sequence.
Can a Contractor Decide What Beam to Install?
Experienced contractors may understand common framing systems and can provide useful practical input.
However, beam selection should be based on:
- Span
- Supported loads
- Building geometry
- Material properties
- Deflection limits
- Bearing
- Connections
- Support below
Formal design may be required when the beam forms part of a permitted structural alteration.
Are Calculations the Same as Structural Drawings?
No.
Structural calculations show how sizes, loads, and capacities were determined.
Structural drawings show how the designed components should be arranged and constructed.
A permit authority may request:
- Drawings only
- Calculations only
- Both drawings and calculations
- A sealed engineering letter
The required documentation depends on the project.
Can Structural Drawings Be Prepared Without a Site Visit?
Sometimes, but a site assessment is often important for renovations.
Existing buildings may differ from:
- Original drawings
- Typical construction
- Previous renovation records
- Visible assumptions
- Current building standards
A site visit may help confirm:
- Joist direction
- Beam locations
- Wall construction
- Foundation condition
- Roof framing
- Existing damage
- Previous alterations
- Available bearing
Exploratory openings may still be needed when important components are concealed.
When Are Exploratory Openings Required?
Exploratory openings may be needed to confirm hidden conditions behind:
- Drywall
- Ceilings
- Flooring
- Insulation
- Roofing
- Siding
- Cabinets
- Masonry
They may be used to verify:
- Beam size
- Joist direction
- Wall framing
- Structural connections
- Foundation thickness
- Roof support
- Existing deterioration
- Previous modifications
The drawings may be based on assumptions when opening the structure is not possible, but those assumptions should be confirmed during construction.
What Happens if Construction Conditions Differ From the Drawings?
Unexpected conditions are common in renovation work.
Examples include:
- Different joist sizes
- Hidden beams
- Missing supports
- Rotten framing
- Foundation cracks
- Buried utilities
- Undocumented renovations
- Poor soil
- Corroded steel
- Unexpected masonry
The contractor should pause the affected work and request revised direction.
Structural changes should not be improvised when they alter the approved design.
Can Structural Drawings Help With Contractor Pricing?
Yes.
Clear drawings allow contractors to estimate:
- Material quantities
- Beam sizes
- Steel fabrication
- Footings
- Shoring
- Demolition
- Labour
- Equipment
- Inspection requirements
Pricing based only on a general renovation concept may exclude important structural work.
A completed drawing package can reduce uncertainty and make quotations easier to compare.
Do Structural Drawings Guarantee There Will Be No Site Changes?
No. Renovations often contain concealed conditions that cannot be confirmed until demolition begins.
Drawings reduce uncertainty, but field changes may still be required.
Common reasons include:
- Hidden damage
- Different framing
- Unexpected utilities
- Poor soil
- Foundation conditions
- Material availability
- Construction tolerances
Changes affecting structural components should be reviewed before work proceeds.
Are Structural Drawings Needed for Insurance Repairs?
They may be required when an insured event damages load-bearing components.
Examples include:
- Fire damage
- Flood damage
- Tree impact
- Vehicle impact
- Roof collapse
- Burst pipes
- Foundation movement
- Severe wind damage
Structural drawings can help define the repair scope and distinguish between finish replacement and structural reconstruction.
Insurance coverage decisions remain separate from the structural design.
Are Structural Drawings Needed for Unpermitted Renovations?
They may be needed when a previous owner completed structural work without approval.
Examples include:
- Removed walls
- Improvised beams
- Missing columns
- Altered roof trusses
- Enlarged openings
- Basement underpinning
- Cut floor joists
Drawings may be required to document corrective work or support a permit application.
Existing concealed work may need to be opened before it can be assessed.
Can Structural Drawings Be Used During a Property Sale?
Structural drawings and related records may help document major renovations.
Useful documents include:
- Permit drawings
- Engineering letters
- Field review reports
- Inspection records
- Contractor invoices
- Municipal approvals
- Final repair documentation
Drawings do not guarantee that the work was constructed exactly as shown. Inspection and completion records provide additional confirmation.
Does the Engineer Inspect the Work?
Field reviews may be required or recommended for structural renovations.
The engineer may review:
- Footings
- Reinforcement
- Beams
- Columns
- Connections
- Joists
- Roof framing
- Underpinning
- Temporary shoring
- Repairs
- Changes from the drawings
Important components should be reviewed before they are concealed when inspections are part of the project.
What Can Go Wrong Without Structural Drawings?
Renovations completed without adequate structural planning may result in:
- Sagging floors
- Roof movement
- Cracked walls
- Sticking doors
- Weak connections
- Undersized beams
- Overloaded columns
- Inadequate footings
- Foundation settlement
- Excessive vibration
- Permit problems
- Failed inspections
- Costly reconstruction
- Resale concerns
Some problems appear immediately. Others develop gradually over time.
When Should Structural Drawings Be Started?
Structural drawings should usually be developed during the renovation design stage.
This allows the engineer, designer, and contractor to coordinate:
- Wall openings
- Beam depth
- Post locations
- Ceiling heights
- Stair openings
- Foundation work
- Plumbing
- Ductwork
- Electrical systems
- Construction sequencing
Early coordination can prevent design conflicts after demolition begins.
Questions to Ask Before Starting a Structural Renovation
Useful questions include:
- Are any walls being removed?
- Is the wall load-bearing?
- Are beams or columns being changed?
- Will joists or rafters be cut?
- Is the roof shape changing?
- Are new openings being created?
- Will the foundation be altered?
- Is the basement being lowered?
- Are heavy features being added?
- Does the work require a permit?
- Are structural drawings required?
- Is temporary shoring needed?
- Will new posts need footings?
- Are exploratory openings required?
- Will the engineer review the construction?
Frequently Asked Questions
Do I need structural drawings to remove an interior wall?
They may be required if the wall is load-bearing or supports a concentrated load. A non-load-bearing partition may not require structural design.
Do I need drawings for an open-concept renovation?
Usually, when walls are removed or large openings are created. The drawings may specify beams, posts, connections, and footing requirements.
Are structural drawings needed for a kitchen renovation?
Not always. They may be needed when walls are removed, openings are enlarged, joists are altered, or heavy features are added.
Do I need structural drawings to finish a basement?
Not necessarily. Drawings may be required if the project changes beams, columns, joists, foundation walls, stairs, or floor elevation.
Are drawings required for a new basement window?
A small opening may follow prescriptive requirements. A large opening, foundation cut, or basement entrance may require structural drawings.
Can a contractor prepare structural drawings?
A contractor may prepare construction sketches, but formal structural drawings may need to be prepared by a qualified design professional.
Are engineering drawings required for a deck?
They may be required for elevated, covered, unusually large, heavily loaded, or complex decks.
Do I need drawings to repair rotten joists?
Minor repairs may use a standard detail. Extensive damage, load-bearing repairs, or multiple affected joists may require project-specific drawings.
Can construction start before structural drawings are complete?
Demolition or construction should not affect load-bearing components until the structural requirements and permit obligations are understood.
Do drawings need to be updated when site conditions change?
Yes, when the change affects the structural design. Revised details or written engineering direction may be required.
Final Thoughts
A renovation generally requires structural drawings when it changes how the building supports and transfers loads.
Projects involving load-bearing walls, beams, columns, floor joists, roof framing, foundations, large openings, additions, underpinning, or structural repairs commonly require professional design.
Structural drawings give contractors clear construction information, support permit applications, and help coordinate the renovation before important components are removed or concealed.
Developing the drawings before demolition can reduce delays, improve pricing accuracy, and help prevent unsafe or costly changes during construction.
This article provides general information and is not a substitute for project-specific structural, architectural, construction, legal, or building permit advice.
Easy steps to create a color palette
Lorem ipsum dolor sit amet, consectetur adipiscing elit lobortis arcu enim urna adipiscing praesent velit viverra sit semper lorem eu cursus vel hendrerit elementum morbi curabitur etiam nibh justo, lorem aliquet donec sed sit mi dignissim at ante massa mattis.
- Neque sodales ut etiam sit amet nisl purus non tellus orci ac auctor
- Adipiscing elit ut aliquam purus sit amet viverra suspendisse potent
- Mauris commodo quis imperdiet massa tincidunt nunc pulvinar
- Excepteur sint occaecat cupidatat non proident sunt in culpa qui officia
What is a color palette?
Vitae congue eu consequat ac felis placerat vestibulum lectus mauris ultrices cursus sit amet dictum sit amet justo donec enim diam porttitor lacus luctus accumsan tortor posuere praesent tristique magna sit amet purus gravida quis blandit turpis.

Don’t overspend on growth marketing without good retention rates
At risus viverra adipiscing at in tellus integer feugiat nisl pretium fusce id velit ut tortor sagittis orci a scelerisque purus semper eget at lectus urna duis convallis porta nibh venenatis cras sed felis eget neque laoreet suspendisse interdum consectetur libero id faucibus nisl donec pretium vulputate sapien nec sagittis aliquam nunc lobortis mattis aliquam faucibus purus in.
- Neque sodales ut etiam sit amet nisl purus non tellus orci ac auctor
- Adipiscing elit ut aliquam purus sit amet viverra suspendisse potenti
- Mauris commodo quis imperdiet massa tincidunt nunc pulvinar
- Adipiscing elit ut aliquam purus sit amet viverra suspendisse potenti
What’s the ideal customer retention rate?
Nisi quis eleifend quam adipiscing vitae aliquet bibendum enim facilisis gravida neque euismod in pellentesque massa placerat volutpat lacus laoreet non curabitur gravida odio aenean sed adipiscing diam donec adipiscing tristique risus amet est placerat in egestas erat.
“Lorem ipsum dolor sit amet consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua enim ad minim veniam.”
Next steps to increase your customer retention
Eget lorem dolor sed viverra ipsum nunc aliquet bibendum felis donec et odio pellentesque diam volutpat commodo sed egestas aliquam sem fringilla ut morbi tincidunt augue interdum velit euismod eu tincidunt tortor aliquam nulla facilisi aenean sed adipiscing diam donec adipiscing ut lectus arcu bibendum at varius vel pharetra nibh venenatis cras sed felis eget.